Every metal we run, down to the gauge.
Grades, finishes, thickness windows and cut behaviour for the six families on our rack — plus what we source when the job calls for more.
THE RACK
FORMS
MILD STEEL
Six families, one rack
Pick a family for its grade sheet — what's stocked, what's sourced, and the numbers that matter at the machine.
We source specialty sheet per job — 3.1 certs attached, lead time on the quote.
Ask about sourcing →Above 8 mm we cut with O₂ — faster, but the edge carries a dark oxide film. Say if it's getting powder coated; we blast it first.
Thickness, by grade
Where each material cuts clean on our fiber laser — and where it's quoted per job with edge notes.
Surfaces, as delivered
What the face looks like when it leaves the machine — before powder coat, anodising or plating.
Need powder coat, anodising, zinc plating or passivation on top? Finishing runs in-house →
Rack, sourced, or yours
Three ways material lands on the machine — all with the same paperwork trail.
Six families, nested same-day. Heat numbers tracked from rack to nest to your delivery note.
Common specialty in 2–4 days, imported plate in 1–3 weeks. The date is firm on the quote.
Bring your own sheet or tube. We inspect it on arrival, log the cert, and cut on the same terms.
Not sure which grade to spec?
Send the drawing and what the part has to survive — we'll match the grade, or price the nearest stock material both ways.